With any wood product there will be natural color variations from piece to piece.
Engineered wood floor laying.
Installing hardwood floor opening hardwood floor prep planks.
Before installing a floating engineered hardwood floor follow the same preparation steps mentioned above including underlayment and laying out spacers to maintain the expansion gap specified by the manufacturer.
Use 1 2 inch spacers to assist in maintaining the 1 2 inch expansion gap between the first row of flooring planks and the wall.
It takes 5 7 days to acclimate an engineered wood floor to a room.
Engineered wood flooring is a beautiful durable flooring product that offers a few different installation options.
Start the heating system at a low but comfortable heat setting and increase it by 2 deg every 2 days working it gradually up to the highest setting.
If you are acclimatising engineered wood flooring for under floor heating we recommend laying each box individually on the ground.
Put the first board up against the mason s line with the groove side facing away from the walls.
A concern with engineered flooring however is.
While some products are designed for glue down application as is often used when installing flooring over a concrete slab this is typically a job for a contractor.
Here s how to install click lock engineered hardwood flooring.